Renovating the bathroom
Quote B is the cheapest - and the only one that leaves out waterproofing.
THE SITUATION
Three contractor quotes that do not quite compare, spec sheets for the tiles and the shower tray, and a walkthrough with a contractor you half-remember.
WHAT GOES IN
WHAT COMES OUT
| Quote A | Quote B | Quote C | |
|---|---|---|---|
| Price | EUR 7,850 | EUR 6,400 | EUR 8,300 |
| Waterproofing | yes | ⚠ missing | yes |
| Duration | 12 days | 9 days | 14 days |
| Guarantee | 2 years | 1 year | 5 years |
SEE IT IN THE APP
Recorded in RealEntity on the free plan. Sample documents; the walkthrough is read by two synthetic voices. The answers are the app's own, unedited.
How RealEntity does it
Every source for the job in one project - the quotes, the spec sheets, the walkthrough, and a 2019 plumbing invoice added from your home vault.
"Which quote leaves out waterproofing?" - quote B, cited to the quote itself, and the shower tray's warranty needs it.
A gap across sources: the tile sheet needs an uncoupling membrane on a timber floor, the floor is timber (the contractor on the walkthrough and the 2019 plumber both say so), and no quote includes it.
Built with sample material - invented documents and people, no real person's data.
Next: A thesis chapter from your interviews →